To control the use of disposition parts inside an
Item Demand, it is possible to leaye related information in the master BOM:
- Engineering Component: the entire component is resolved (definition
possible without CX_DISPOSITION_BOM object)
- Loose Piece: a single part can be passed from its "bottom"
component into a higher one
(definition requires CX_DISPOSITION_BOM object)
- Disposition Component: A new, pure disposition component can be
integrated into the product structure (definition requires CX_DISPOSITION_BOM
object)
After Resolving the BOM, these master
information is adopted into the Resolved Product
BOM.
Further Information
